CPCCBC5004 Assessment Task 2 - Practical Assignment

Get Expert's Help on Practical Assessment

Hire a tutor for this answer

We have Professional Tutors available for all subjects, Unlock Your Potential with Personalized Tutoring

LiveChat / WhatsApp

Our expert tutors are available 24/7 to help you achieve your academic goals

Ask a New Question

We provide personalized tutoring and homework assistance services to help students of all levels succeed.

Assessment Task 2 - Practical Assignment

Overview

This assessment task requires the student to apply quality standards to selecting specified construction materials and supervising on-site processes for acquiring, receiving and storing materials for one building and construction project.This includes:

·      Identifying and interpreting the building and construction materials specified in project building specifications or contract documentation.

·      Communicating effectively with manufacturers and suppliers.

·      Supervising material acceptance, handling, and storage.

·      Confirming the accuracy of delivered materials and products in relation to delivery orders and compliance with project specifications.

·      Carrying out material testing:

o  Arranging for and receiving results from external quality testing or inspections

o  Arranging for on-site quality and suitability testing

o  Taking corrective action in response to non-conforming test results

·      As required by the organisation, provide regulatory authorities with advice and information.

The building and construction project must be a large residential or commercial building.

Note: The above specifications for the building are compulsory to meet the requirements of the National Construction Code (NCC).

This assessment has five parts:

·      Activity 1 - Determine the properties of building materials.

·      Activity 2 - Select suitable building materials for the application.

·      Activity 3 - Supervise the acceptance, safe handling and storage of materials on site.

·      Activity 4 - Supervise suitability and fit for purpose testing of materials.

·      Activity 5 - Establish, record and report findings.

You must:

·      The student must assess the NCC codes for the relevant class of the building to perform the activities specified in the assessment task.

·      The student must supervise the various aspects of the construction.

·      Review the task instructions included in this Practical Assignment

·      Record your response as required in the instructions

Activity 1: Determine the properties of building materials.

This activity requires you to determine the properties of building materials for the project assigned.

To complete this activity, you are required to:

  • Complete the steps given in the ‘Checklist 1’ provided.
  • Access and interpret NCC codes and relevant Australian Standards referenced in the NCC.

While completing each step, you must place a tick mark against each step given in the checklist once completed.

Instructionso   Project plans and specifications from Basalt Residential development

o   Material specifications

o   NCC Vol 1- Vol 3 (Provided along with this assessment)

·       The trainer/assessor (Supervisor) must observe the student performing this activity and sign off the checklist after completing each step.

·       Prior to starting this assessment, you are required to develop a site delivery plan covering all WHS requirements for the unloading of truck, any crane requirements, and any manual handling requirements.

Activity 2: Select suitable building materials for the application.

This activity requires you to select suitable building materials for the application for the project assigned.

To complete this activity, you are required to:

  • Complete the steps given in the ‘Checklist 2’ provided.
  • Access and interpret NCC codes and relevant Australian Standards referenced in the NCC.
  • Complete Template 2.

While completing each step, you must place a tick mark against each step given in the checklist once completed.

Activity 3: Supervise the acceptance, safe handling and storage of materials on site.

This activity requires you to supervise the acceptance, safe handling and storage of materials on-site for the project assigned.

To complete this activity, you are required to:

  • Complete the steps given in the ‘Checklist 3’ provided.
  • Access and interpret NCC codes and relevant Australian Standards referenced in the NCC.
  • Complete Template

While completing each step, you must place a tick mark against each step given in the checklist once completed.

Activity 4: Supervise suitability and fit for purpose testing of materials.

This activity requires you to supervise the suitability and fit for purpose testing of materials for the project assigned.

To complete this activity, you are required to:

  • Complete the steps given in the ‘Checklist 4’ provided.
  • Access and interpret NCC codes and relevant Australian Standards referenced in the NCC.
  • Complete Template 4.

While completing each step, you must place a tick mark against each step given in the checklist once completed.

Instructions for trainer/assessor:·       The trainer/assessor must ensure that the student has access to the following documents:

o   Project plans and specifications.

o   Material specifications

o   NCC Vol 1- Vol 3 (Provided along with this assessment)

·       The trainer/assessor (Supervisor) must observe the student performing this activity and sign off the checklist after completing each step.

Activity 5: Establish, record and report findings.

This activity requires you to establish, record and report findings for the project assigned.

To complete this activity, you are required to:

  • Complete the steps given in the ‘Checklist 5’ provided.
  • Access and interpret NCC codes and relevant Australian Standards referenced in the NCC.
  • Complete Template

While completing each step, you must place a tick mark against each step given in the checklist once completed.

Instructions for trainer/assessor:

·       The trainer/assessor must ensure that the student has access to the following documents:

o   Project plans and specifications.

o   Material specifications

o   NCC Vol 1- Vol 3 (Provided along with this assessment)

·       The trainer/assessor (Supervisor) must observe the student performing this activity and sign off the checklist after completing each step.

Solution

Hire Expert Tutors

Get Professional Tutoring at Low Price in Australia


Professional

Tutoring Services

25,187+

Orders Delivered

4.9/5

5 Star Rating

621

PhD Experts

 

Amazing Features

Plagiarism Free

Top Quality

Best Price

On-Time Delivery

100% Money Back

24 x 7 Support

TOP